HomeTransportCouncil increases pothole repair efforts across Brighton

Council increases pothole repair efforts across Brighton

Published on

The local authority has expanded its highway maintenance workforce significantly.

Brighton and Hove City Council boosted its field teams from two groups to ten starting in March, after a prolonged period of freezing temperatures and rainfall during the earlier part of the year.

Municipal records show 1,004 potholes were repaired throughout January, increasing to 1,374 in February, while 610 pavement restorations were completed during those two months combined.

Councillor Trevor Muten, who serves as cabinet member for transport and city infrastructure, stated: “Improving our highways and walkways represents a primary focus for us, which is why we’ve increased our repair crews by more than four times.

We understand residents are dissatisfied with the state of certain roads in our area and we are determined to improve conditions.

Sustained insufficient funding has created an extensive repair backlog, not only in Brighton and Hove but throughout the nation.

However, we have pledged to invest no less than £8.8 million in improvements during the coming year, with £2.2 million allocated to addressing the most urgent issues.

We are taking immediate action to resolve the most severe problems.

Looking ahead, we have developed a comprehensive preservation strategy that will prolong the lifespan of our roads and walkways, prevent defects from occurring initially, and decrease future maintenance requirements.”

The authority reported that every reported pothole and street defect undergoes investigation and evaluation, with crews also conducting routine examinations of roadways to identify problems before they worsen.

Each issue receives a classification according to its dimensions, depth, positioning, and potential hazard level.

Maintenance personnel are then dispatched within timeframes ranging from two hours to 28 days, contingent upon the severity, placement, and category of the defect.

Latest articles

Four Sussex restaurants to close as Whitbread shuts all 195 UK sites

Whitbread is set to close four restaurant locations across Sussex as part of a significant company restructuring programme affecting nearly 200 sites across the United Kingdom. The hospitality group ...

Chichester Festival Theatre announces winter programme with comedy icons and West End hits

Chichester Festival Theatre has announced its autumn and winter season lineup, featuring productions spanning drama, music, comedy and movement. Opening the seasonal schedule, The Last Laugh will occ...

Track circuit failure cancels Littlehampton to London Victoria trains until 1pm

Rail services connecting Littlehampton with London Victoria have been suspended in both directions following a technical fault. A track circuit failure has been identified as the cause of the disrupt...

Man’s earlobe bitten off in unprovoked attack at Chichester railway station

An investigation has been launched after a man sustained a partial ear amputation during an assault at a railway station car park. The incident occurred in the car park at Chichester railway station ...

More like this

Four Sussex restaurants to close as Whitbread shuts all 195 UK sites

Whitbread is set to close four restaurant locations across Sussex as part of a significant company restructuring programme affecting nearly 200 sites across the United Kingdom. The hospitality group ...

Chichester Festival Theatre announces winter programme with comedy icons and West End hits

Chichester Festival Theatre has announced its autumn and winter season lineup, featuring productions spanning drama, music, comedy and movement. Opening the seasonal schedule, The Last Laugh will occ...

Track circuit failure cancels Littlehampton to London Victoria trains until 1pm

Rail services connecting Littlehampton with London Victoria have been suspended in both directions following a technical fault. A track circuit failure has been identified as the cause of the disrupt...