Good morning
The A27 at Falmer is experiencing significant delays this morning because of construction work for a new Greggs drive through at a local petrol station.
A single lane is blocked on the A27 eastbound between B2123 The Drove (Falmer/Rottingdean Junction) and A277 Brighton Road (Ashcombe Roundabout).
How long are the delays?
Currently, there are significant delays of 14 minutes.
Read more about the Greggs construction here
Delays have grown to 20 minutes.
Area of congestion
There are currently significant delays on the A27 (Image: AA)
Significant delays persist. The current delay is 15 minutes.
What is the current situation?
Motorists are facing lengthy delays on A27 Brighton Road eastbound past the B2123 The Drove (Falmer/Rottingdean Junction). Traffic extends toward Brighton (Hollingbury turn-off). Within the work zone. Down to one lane in the direction of Lewes. Journey time is 35 minutes.
